WPC Primary Clarifier Discharge Line Replacement

The Water Pollution Control department made a repair to the primary pipeline in the fall of 2017 and we will be continuing to replace a segment of large diameter critical piping at the Pocatello Wastewater Treatment Plant. The pipe has significant corrosion and is a critical component of the wastewater treatment plant. Design by Engineering Dept.: Construction by Contractor TBD: Estimated cost is $85,000: Funding by WPC Capital Improvements fund. This project will be bid and constructed in Spring 2018.