Pocatello Creek Bank Stabilization

January 10, 2019 The first photo shows excavating below the bottom of the stream channel to install the rock toe, this helps armor the bank below the water surface even if the channel continues to erode. The Contractor then placed the first row of the Flex MSE Vegetated Wall System tying it into armored rock … Continue reading Pocatello Creek Bank Stabilization